MOYLE INTERCONNECTOR LIMITED

8 unique locations (57 components)

Active MW: 270.00 MW
Inactive MW: 1485.00 MW
Auchencrosh Converter Station, Ballantrae, Girvan, KA26 0PE (4 components)

The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. …

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Auchencrosh Converter Station, Ballantrae, Girvan, KA26 OPE (4 components)
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) Public Limited Company, all part of the Mutual Energy Limited group of companies.
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) plc, all part of the Mutual Energy Limited group of companies.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Auchencrosh Converter Station, Glenapp Estate, Ballantrae, Girvan, KA26 0NY (3 components)

The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. …

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Auchencrosh Converter Station Glenapp Estate Ballantrae GIRVAN KA26 0NY (1 component)

The Moyle Interconnector is a dual monopole Light Triggered Thyristor HVDC interconnector. Each pole operates at 250kV, and can transmit 250MW of power. Both poles operate together to provide seamless …

Active • 2028-29 (T-4)
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (28 components)
• Peterhead 1
• Peterhead CCGT
• Peterhead CCGT for Delivery Year 2018/19 only
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Shingle Hall, Trimms Green, Sawbridgeworth, CM21 0LX (1 component)

A new build gas fuelled generating station.

Inactive • 2020-21 (T-4)
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (11 components)
• 2 stream municipal waste incinerator
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Stone Street, Hereford, Herefordshire, HR2 9NJ. (5 components)

Energy facility comprising of reciprocating engine sets.

Inactive • 2020-21 (T-4), 2017-18 (T-1)